Tel Aviv Red Line Project, Israel
Introduction: In 2015, CREG secured an order of six EPB TMBs for Tel Aviv Red Line Project (West Segment), which all successfully completed the excavation tasks as scheduled on September 20th, 2018.

Project Facts

Product Facts

In 2015, CREG secured an order of six EPB TMBs for Tel Aviv Red Line Project (West Segment), which includes six underground stations, two 5.5km bored tunnels and 16 cross passages. Geology therein is mainly Kurkar formation with quick sand, which makes settlement control extremely difficult and requires large torque with robust thrust force. A service team and a spare parts warehouse were set up at the project site for whole-life-cycle service, which provided a strong guarantee for the safe and efficient operation of six TBMs. On September 20th, 2018, all six TBMs successfully completed the excavation tasks as scheduled.


Machine Specification

Machine Specification

Project: Israel Red Line Project

Location: Tel Aviv, Israel

Year: 2015-2017

Application: Metro

Tunnel length: 10,580m

Type: 6 x EPB TBM

Diameter: 7.54m

Lining method: Segment

Drive power: 1,600kW

Cutterhead drive: Electrical

Torque: 12,000 kNm

Advance speed: 80 mm/min

Thrust Force: 55,750 kN





Geological Features

Geological Features

Argillaceous sand, Kurkar ground (K1, K2, K3 and K4).