Dubai Deep Tunnel Storm Water System Project, UAE
Introduction: Two Φ11.05m CREG EPB TBMs for Φ11.05m EPB TBMs for DS233/2 Deep Tunnel Storm Water System in Dubai, UAE to serve World Expo 2020.

Project Facts

Product Facts

CREG designed and manufactured two Φ11.05m EPB TBMs for DS233/2 Deep Tunnel Storm Water System in Dubai, UAE to serve World Expo 2020. The tunnel, 10,426m in length, is the main tunnel of the whole flood and stormwater discharge system, and will pass through sandstone and mudstone strata. The breakthrough of the two TBMs were achieved on April 11, 2020 and June 11, 2020.


Machine Specification

Machine Specification

Machine length: 85m

Machine weight: 2000 tons

Maximum thrust: 118752 kN

Max. advance speed: 80mm/min

Tunnel length: 10,426m 

Geological Features

Geological Features

Sandstone and mudstone.