Jilin Yinsong Water Diversion Tunnel Project, China
Introduction: The 8.03m Hard Rock TBM designed and manufactured by CREG was employed in the Lot 4 of Jilin Yinsong Water Diversion Project.

Project Facts

Product Facts

The 8.03m Hard Rock TBM designed and manufactured by CREG was employed in the Lot 4 of Jilin Yinsong Water Diversion Project. Equipped with integrated multiple system coordination and control technology, high-efficiency rock-breaking cutterhead with non-linear layout and small cutter spacing, with efficient, safe and fast support system and geology forecast/detection with 3D induced polarized probe, this machine has broken through a number of technical difficulties. Since its launching in May 2015, CREC 188 has overcome numerous geological challenges, i.e. karst caves, carbonaceous slate sections, fault fracture zones, extra-large water and slurry inflows, completed the advancing of 8,581 meters, with an average monthly advancing of more than 600 meters, and set a record of 1,314m monthly rate.


Machine Specification

Machine Specification

TBM Diameter: 8,030 mm

Total Thrust: 23,260 kN

Rock Strength: 80 - 130 Mpa

Tunnel Length: 20,198 m

Tunnel Type: Water Tunnel

Maximum Torque: 12,615 kNm (breakout torque)

Cutterhead Drive: Electric, variable speed

Cutterhead Power: 10×350=3,500 kW

Cutterhead Rotation: 0-3.97-7.6 rpm

Geological Features

Geological Features

Granite, limestone, diorite, and siltstone.