Project Facts
 Product Facts
Product FactsThese products have been used in several projects including Xi'an-Chengdu high speed railway, Wudongde Hydropower Station, Yuqian Railway, Changlin High Speed Railway and Lixiang Railway. The accumulated spraying amounts to 100,000 m3 and for each unit of equipment, the monthly spraying averages 1,500 m3. The project quality and performance were well and widely recognized by clients.
Machine Specification
 Machine Specification
Machine SpecificationTo be added.
Geological Features
 Geological Features
Geological Features