EPB TBM
Introduction: In 2015, CREG secured an order of six EPB TMBs for Tel Aviv Red Line Project (West Segment), which all successfully completed the excavation tasks as scheduled on September 20th, 2018.

Project Facts

Product Facts

In 2015, CREG secured an order of six EPB TMBs for Tel Aviv Red Line Project (West Segment), which includes six underground stations, two 5.5km bored tunnels and 16 cross passages. Geology therein is mainly Kurkar formation with quick sand, which makes settlement control extremely difficult and requires large torque with robust thrust force. A service team and a spare parts warehouse were set up at the project site for whole-life-cycle service, which provided a strong guarantee for the safe and efficient operation of six TBMs. On September 20th, 2018, all six TBMs successfully completed the excavation tasks as scheduled.



Machine Specification

Machine Specification
TBM EX WorksMay 2016
Tunnel Length
6044.5 m (6 TBMs)
Boring Dia.7.54 m
Main Drive Power1,600 kW
Best Monthly Performance320 m/month


Geological Features

Geological Features

Kurkar formation with quick sand.