Project Facts
The project is a two-hole two-lane tunnel with a total length of 4.3 kilometers. Two EPB TBMs with a diameter of 5.81m are used for tunnel excavation. The CITYRINGEN Metro Circle Line connects the southern seaport area of Copenhagen, the emerging urban development area and other urban areas. Its construction can greatly improve the public transportation in Copenhagen.
Machine Specification
Excavation diameter: 5,810 mm
Total length of machine: approx. 143 m
Total weight of machine: approx. 625 t
Drive power: 1,500 kW
Nominal torque: 4,396 kN∙m
Max. torque: 5,275 kN∙m
Rotation speed: 0-7.24 rpm
Max. advance speed: 80 mm/min
Geological Features
Limestone, Copenhagen limestone and Bryozene limestone.